Calculate how tariffs affect your project budget.
National Economic Webinar
Live Stream
June 26
2 PM CDT

Confidential Semiconductor Manufacturing Client

Ground-Up Fab and Phased Renovations

Project Highlights

JE Dunn JE Dunn provided phased construction services to expand a confidential client’s advanced manufacturing production capacity.

Building 2: Fast-track conversion of office space to cleanroom wafer manufacturing with 4,700 square feet of ISO Class 6 clean room space, supported by 3,225 square feet of chase space, designed to meet ISO Class 7 standards.

Building 3: 141,644-square-foot warehouse, testing and office facility equipped to accommodate 200+ employees. The facility includes 20,000 square feet of ISO-6/ISO-7 clean room space.

Building 4: 193,000-square-foot core and shell addition to an existing building built out with 43,000 square feet of clean room fabrication space. The building is designed to accommodate a build out of ISO-Class 6 in an open “ballroom” configuration and as an H-5 occupancy, with H-2 and F-1 accessory uses.

  • Central Utility Building: new building to house chiller room, electrical room with mechanical mezzanine above, and UPW room.
  • Gas Bay Portion: single-story area, H-2 occupancy, on the south side of the building, which houses a generator room, gas bay room and receiving area for the loading dock.
  • Fab Level: 35,000 square feet of cleanroom located in the northeast corner. The cleanroom area is designed on a cheese slab and a 24” raised access floor.
Confidential
Owner/Client
Mazzetti / BurkettEUA
Architect
Fort Collins, Colorado
Location
November 2016
Completion Year
108,000
Square-Foot Cleanroom

Gallery

No data was found
No data was found